


Some of the steps that I took.
- new project
- new event
- import media
- go through the videos and see which are good takes.
- imported the ones that I thought were good takes.
- took screen grabs (using CMD+SHIFT+3)
- labelled them, if they are good or bad takes.
- I logged them to show what scenes and takes are taking place.
I also logged the scenes, so that I knew which ones were which and what order that they go in. I did this to show what scene and which take is taking place.
I actually only didn't import about two takes, so there is still roughly about eighteen shots and takes that I am using in this task. The reason that I didn't include these two takes was due to the cameraman being in frame, he is seen in the reflection of the car window, making the two takes unusable. I noticed this by looking through the rushes aka the raw material.
Final deadline :Friday 18TH December (10:00 am)
Prep deadline:Friday 11TH December (1:40 pm)
Rough cut deadline:Monday 14TH December (12:10 pm)